De-commisioning PET plants Indorama
This means delivering the PET plants clean and free of chemicals. This has been a 3-month process with an ever-shrinking organization and all the associated challenges. I reported to the Site Decommissioning Lead and participated in site status meetings. For the work, I prepared various plans for cleaning and later delivering the empty factories. Reporting the evidence of the work carried out was also one of my tasks. This includes consultation with authorities to properly comply with applicable rules for abandoning a production site.The control of chemical removal from the plants and later removal from the site took place in close cooperation with logistics, the waste coordinator, and myself. This was a challenging task because normally there is no suitable piping present for removing chemicals from a pplant. This needs to be devised, and additionally, we must test the plans against the applicable safety rules and take into account the use of the correct materials. During this period, I led a dedicated operations team that ensured that the agreements made were carried out on time despite the shrinking organization.